EconPapers    
Economics at your fingertips  
 

The impact of failure, repair and joint imbalance of processing time means and buffer sizes on the performance of unpaced production lines

Sabry Shaaban, Tom McNamara and Sarah Hudson

International Journal of Manufacturing Technology and Management, 2015, vol. 29, issue 5/6, 347-365

Abstract: This article studies the performance of unpaced serial production lines that are subject to breakdown and are imbalanced in terms of both of their processing time means (MTs) and buffer storage capacities (BCs). Simulation results show that the best pattern in terms of throughput (TR) is a balanced line. With respect to average buffer level (ABL), the best configuration is a monotone decreasing MT order, together with an ascending BC arrangement. Statistical analysis shows that BC, combined patterns of MT and BC imbalance, line length and degree of imbalance all contribute significantly to performance.

Keywords: unreliable production lines; unpaced serial lines; simulation; unequal mean operation times; uneven buffer capacities; imbalance patterns; throughput; average buffer level; ABL; failure; repair; imbalance; line length; processing time; buffer sizes. (search for similar items in EconPapers)
Date: 2015
References: Add references at CitEc
Citations:

Downloads: (external link)
http://www.inderscience.com/link.php?id=71228 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:ids:ijmtma:v:29:y:2015:i:5/6:p:347-365

Access Statistics for this article

More articles in International Journal of Manufacturing Technology and Management from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().

 
Page updated 2025-03-19
Handle: RePEc:ids:ijmtma:v:29:y:2015:i:5/6:p:347-365