Pre-settlement audit in project cost management based on cloud computing
Daibing Cheng,
Zhongyan Luo,
Rong Ju and
Yong Zhang
International Journal of Manufacturing Technology and Management, 2024, vol. 38, issue 4/5, 361-381
Abstract:
This research mainly analysed the audit method of pre-settlement in project cost management, which served as a reference for the work in this field. The basis of the pre-settlement audit was the specific information of construction material submitted by the construction party to ensure its authenticity and legitimacy, so that the benefits of investment could be fully exerted, and the ultimate goal of resources optimal allocation could be achieved. Because the pre-settlement audit was an extremely important process in the standardised project cost, there was a need to improve the audit level so that the effective management objectives could be achieved. Therefore, we introduced cloud computing to provide a certain basis for reducing audit cost effectively. The experimental results showed that the application of the cloud computing to the pre-settlement audit had produced positive effects, and the accuracy of the audit calculation could reach about 91%.
Keywords: cloud computing; project cost management; pre-settlement work; review method. (search for similar items in EconPapers)
Date: 2024
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.inderscience.com/link.php?id=139522 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijmtma:v:38:y:2024:i:4/5:p:361-381
Access Statistics for this article
More articles in International Journal of Manufacturing Technology and Management from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().