Process-integrated quality monitoring and control in closed die forging
Heiko Schneider, Soenke Ruesch
International Journal of Manufacturing Technology and Management, 2002, vol. 4, issue 6, 479-488
Abstract:
Because of the high temperatures of closed die forged parts during and after deformation, a direct in-process acquisition of the workpiece quality is not possible. In order to improve the economic efficiency of the process by means of process-integrated methods for quality inspection, an indirect procedure for workpiece inspection has to be used. For an exemplary forging process, such a monitoring system has been realised. It allows a quick evaluation of the product quality directly after the forging cycle. Additionally, a trend-detection and automatic control are integrated into this system. These modules are supposed to keep the workpiece quality constant within the tolerance limits even for trend-like process variations.
Keywords: hot metal forming; computer aided quality assurance (CAQ); forging; process control; process automation; trend analysis. (search for similar items in EconPapers)
Date: 2002
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.inderscience.com/link.php?id=2520 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijmtma:v:4:y:2002:i:6:p:479-488
Access Statistics for this article
More articles in International Journal of Manufacturing Technology and Management from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().