Hybrid artificial neural network and statistical model for forecasting project total duration in earned value management
You Li and
Lu Liu
International Journal of Networking and Virtual Organisations, 2012, vol. 10, issue 3/4, 402-413
Abstract:
The paper proposes a new hybrid approach for forecasting project total durations in earned value management, which combines artificial neural network and random number simulation method to forecast the earned schedule indicator of each period one step further based on several nearest finished periods' status and then employs statistical method to estimate the project total duration and its intervals in each period of the project. Experiment results and test show our hybrid model outperforms the classic method of earned value management in both aspects of interval estimation and point estimation.
Keywords: project management; earned value management; EVM; artificial neural networks; ANNs; earned schedule; forecasting; statistical modelling; total project duration; random number simulation. (search for similar items in EconPapers)
Date: 2012
References: Add references at CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://www.inderscience.com/link.php?id=46460 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijnvor:v:10:y:2012:i:3/4:p:402-413
Access Statistics for this article
More articles in International Journal of Networking and Virtual Organisations from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().