An optimisation technique for crashing PERT network in project management

Bibhuti Bhusan Tripathy

International Journal of Operational Research, 2011, vol. 10, issue 3, 277-289

Abstract: The planning and the subsequent scheduling of a complex project allow us, to identify the duration of the project itself in relation to the assignment costs of the various activities, so as to achieve an acceptable situation of balance between times and costs. This paper presents a method for shortening total project time by determining appropriate activities for crashing in program evaluation review technique (PERT) with a minimum cost. The aim of the study is to crash the pessimistic time in PERT networks by investing the additional amount of money in the activities on the critical path.

Keywords: project management; PERT; crashing; project duration; total project time; critical path. (search for similar items in EconPapers)
Date: 2011
References: Add references at CitEc
Citations:

Downloads: (external link)
http://www.inderscience.com/link.php?id=38902 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:ids:ijores:v:10:y:2011:i:3:p:277-289

Access Statistics for this article

More articles in International Journal of Operational Research from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().

 
Page updated 2025-03-19
Handle: RePEc:ids:ijores:v:10:y:2011:i:3:p:277-289