Project crashing in the presence of general non-linear activity time reduction costs

Moustapha Diaby, Jose M. Cruz and Aaron L. Nsakanda

International Journal of Operational Research, 2011, vol. 12, issue 3, 318-332

Abstract: In this paper, we are concerned with the project crashing problem. The functional form we consider for the crashing costs is a negative-exponential form of the amount of capital invested that captures most of the more realistic forms that have been proposed in the literature. We formulate a non-linear optimisation model of the resulting generalised crashing problem, and develop a convex geometric programming approximation of this model. The model can be readily extended to handle situations where it is desired to determine the minimum capital investment needed to crash activities so that the total project duration does not exceed a given time length. Numerical illustrations of the approach are provided.

Keywords: project management; activity crashing; project time–cost analysis; geometric programming; project crashing; nonlinear optimisation; capital investment; project duration. (search for similar items in EconPapers)
Date: 2011
References: Add references at CitEc
Citations: View citations in EconPapers (3)

Downloads: (external link)
http://www.inderscience.com/link.php?id=42919 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:ids:ijores:v:12:y:2011:i:3:p:318-332

Access Statistics for this article

More articles in International Journal of Operational Research from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().

 
Page updated 2025-03-19
Handle: RePEc:ids:ijores:v:12:y:2011:i:3:p:318-332