Technical note: a single-pass heuristic for multi-mode single-resource constrained project scheduling
Chuda Basnet
International Journal of Operational Research, 2016, vol. 26, issue 1, 52-61
Abstract:
We consider the resource-constrained project scheduling problem where only a single renewable resource is available. Such projects occur frequently in practice: such as construction projects with labour as the single resource or software projects with limited number of programmers. Usually, the manpower needs of activities in the project are estimated in units such as work-hours or work-days. Activity durations may be shortened by scheduling more resource. The contribution of this paper is a new heuristic, whose objective is to minimise the makespan of the project while staying within the constraints of available resource. The new heuristic is compared with existing heuristics. Computational results are presented.
Keywords: project management; renewable resources; multi-mode resource constraints; project scheduling; single-pass heuristics. (search for similar items in EconPapers)
Date: 2016
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.inderscience.com/link.php?id=75649 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijores:v:26:y:2016:i:1:p:52-61
Access Statistics for this article
More articles in International Journal of Operational Research from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().