Fuzzy AHP model for challenges to thermal power plant establishment in India
Varinder Kumar Mittal,
Rahul Sindhwani,
Himanshu Shekhar and
Punj Lata Singh
International Journal of Operational Research, 2019, vol. 34, issue 4, 562-581
Abstract:
Thermal power plant is a huge project in context of resource utilisation, time required for its completion and also large amount of funds are required for its establishment. So, delay in any activity especially activity of critical path would results in delay of whole project. Due to delay, the stress on the resources would also increase, which may further result in substandard quality of work. A fuzzy AHP process model has been used to prioritise the challenges to thermal power plant establishment through the inputs by experts from managers at the actual construction sites, designers, and consultants. The challenges identified in the present study can be categorised in three categories viz. high impact, medium impact and least impact challenges. This paper presented the ranking of 19 challenges faced in the establishment of a new thermal power plant in India.
Keywords: fuzzy AHP; challenges; multi-criteria decision making; ranking; project management; thermal power plant. (search for similar items in EconPapers)
Date: 2019
References: Add references at CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://www.inderscience.com/link.php?id=99109 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijores:v:34:y:2019:i:4:p:562-581
Access Statistics for this article
More articles in International Journal of Operational Research from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().