Permutation flow shop scheduling: variability of completion time differences – NP-completeness

Barbara König, Rainer Leisten and Jan Stückrath

International Journal of Operational Research, 2020, vol. 39, issue 4, 562-573

Abstract: We consider the permutation flow shop scheduling problem and aim to obtain smoothness of jobs' completion times, by minimising the variance or the variability of inter-completion times. This problem, including an efficient heuristics, was introduced in Leisten and Rajendran (2015). Here we solve an open problem from that paper and show that the problem for more than two machines is NP-complete.

Keywords: flow shop scheduling; variability of completion time differences; NP-completeness; optimisation; operational research. (search for similar items in EconPapers)
Date: 2020
References: Add references at CitEc
Citations:

Downloads: (external link)
http://www.inderscience.com/link.php?id=111343 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:ids:ijores:v:39:y:2020:i:4:p:562-573

Access Statistics for this article

More articles in International Journal of Operational Research from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().

 
Page updated 2025-03-19
Handle: RePEc:ids:ijores:v:39:y:2020:i:4:p:562-573