A note on time/cost tradeoff curve generation for project scheduling with multi-mode resource availability costs
Denise Sato Yamashita and
Reinaldo Morabito
International Journal of Operational Research, 2009, vol. 5, issue 4, 429-444
Abstract:
In this note we combine two known algorithms and show how they can be used in order to generate tradeoff curves between time and cost for deterministic project scheduling problems with multiple modes and resource availability costs. The approach can handle linear and non-linear non-decreasing cost functions and it is based on the exact algorithm presented in Demeulemeester (1995) for the resource availability cost problem without multiple modes. As the problem is NP-hard, the method is computationally viable to solve only problems of a moderate size. The performance of the combined algorithm is compared to solutions generated by GAMS/CPLEX.
Keywords: project scheduling; resource availability cost; multiple modes; time-cost tradeoff curves; exact algorithm. (search for similar items in EconPapers)
Date: 2009
References: Add references at CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://www.inderscience.com/link.php?id=25702 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijores:v:5:y:2009:i:4:p:429-444
Access Statistics for this article
More articles in International Journal of Operational Research from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().