EconPapers    
Economics at your fingertips  
 

Development and application of a simulation model for throughput improvement in the melting shop of a steel plant

S. Nandagawe and S.P. Sarmah

International Journal of Operational Research, 2009, vol. 6, issue 2, 267-281

Abstract: This paper discusses the use of a simulation model to improve the throughput in the Steel Melting Shop (SMS) of a steel plant located in the eastern part of India. The simulation model developed was first validated to confirm that it represents the system in reality. This valid model is then used to identify bottlenecks in the system. Results from the simulation study identified that in the present working system, the set-up time due to grade change at Continuous Casting Machines (CCMs) acts as a bottleneck in the SMS. Further, through simulation study, optimum casting plan horizon is identified.

Keywords: simulation; throughput improvement; steel plant; bottlenecks; delay; India; set-up times; continuous casting machines; casting plan horizon. (search for similar items in EconPapers)
Date: 2009
References: Add references at CitEc
Citations:

Downloads: (external link)
http://www.inderscience.com/link.php?id=26538 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:ids:ijores:v:6:y:2009:i:2:p:267-281

Access Statistics for this article

More articles in International Journal of Operational Research from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().

 
Page updated 2025-03-19
Handle: RePEc:ids:ijores:v:6:y:2009:i:2:p:267-281