Supply chain model with stochastic lead time under imprecise partially backlogging and fuzzy ramp-type demand for expiring items
S.R. Singh and
Chaman Singh
International Journal of Operational Research, 2010, vol. 8, issue 4, 511-522
Abstract:
The objective of this research is to develop a multi-echelon supply chain model with fuzzy ramp-type demand rate and imprecise partial backlogging rate of unsatisfied demand, considering the effect of inflation and time value of money. Supplier's lead time is a stochastic function of his managing cost. The extra costs incurred on retailer, due to the uncertain lead time in terms of shortages costs or lost sales costs are owed by the supplier. The items have a certain expiration date, due to the fact there is decline in the demand rate with time, but after a period of time it becomes steady. A numerical example is cited to illustrate the results and its significant features. Finally, to study the effect of changes of demand parameters, deterioration, inflation and partially backlogging rate on supplier's and the retailer's profit, a sensitivity analysis is presented numerically.
Keywords: supply chain management; SCM; uncertain lead times; ramp-type demand rate; inflation; modelling; imprecise partial backlogging; fuzzy demand; multi-echelon supply chains. (search for similar items in EconPapers)
Date: 2010
References: Add references at CitEc
Citations: View citations in EconPapers (4)
Downloads: (external link)
http://www.inderscience.com/link.php?id=34866 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijores:v:8:y:2010:i:4:p:511-522
Access Statistics for this article
More articles in International Journal of Operational Research from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().