Lead time reduction: early supplier involvement and the information supply chain
John D. Hanson
International Journal of Procurement Management, 2018, vol. 11, issue 3, 370-386
Abstract:
Lead time reduction is a central concern of procurement, but is critical in the initial launch of newly designed or revised products. Early supplier involvement is often advocated for reducing these lead times, but empirical studies show equivocal results. This paper draws from literature on concurrent engineering to explore the mechanisms available for lead-time reduction in the supply chain. It is shown that these mechanisms depend on flows of the information that is created during the process. There is, in effect, a supply chain for information that must be recognised and managed. Conditions are identified that are necessary for early supplier involvement to result in lead time reduction and offered as testable hypotheses for future research.
Keywords: early supplier involvement; ESI; lead time reduction; LTR; concurrent engineering; 3DCE. (search for similar items in EconPapers)
Date: 2018
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.inderscience.com/link.php?id=91671 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijpman:v:11:y:2018:i:3:p:370-386
Access Statistics for this article
More articles in International Journal of Procurement Management from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().