Abstract:
This article which is the first in the compensation events series identified significant compensation events in relation to construction time from the perspective of the consultant, client and contractor. Significant compensation events under cost and profit will be looked at in the subsequent papers. Quantitative research approach was espoused and purposive sampling was used to determine the respondents. Twenty-five identified compensation events were significantly tested and ranked in order of importance using the relative importance index. Inexperience, poor communication and clients with no technical background were identified to be the most significant. Factor analysis carried out indicated that variables had common underlying factors. The significant common factors of compensation events identified after reduction analysis were work interruptions, inconsistent instructions and late implementation. It was also revealed that compensation events tend to drag most construction projects. Hence, their origination must be assessed and solutions implemented for a successful project completion.
Keywords: compensation events; construction time; relative importance index; factor analysis; tripartite; Public Procurement Act; PPA; contractors; clients; consultants; Ghana. (search for similar items in EconPapers)
Date: 2019
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.inderscience.com/link.php?id=102147 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijpman:v:12:y:2019:i:5:p:518-548
Access Statistics for this article
More articles in International Journal of Procurement Management from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().