Analysis of trans-Pyrenean railway bottlenecks
Susana Val and
Natalia Blazquez
International Journal of Procurement Management, 2009, vol. 2, issue 4, 388-402
Abstract:
This paper provides a full analysis of the bottlenecks in Irun and Portbou (located on the Spanish and French sides, bordering on the Atlantic and Mediterranean coast, respectively) to show the importance of the construction of a new trans-Pyrenean corridor to avoid congestion. The current freight traffic conditions in the Iberian Peninsula are analysed, focusing on incoming cargo flows and its subsequent transport to European destinations. One of the most favourable solutions is the construction of a new high-capacity railway link across Central Pyrenees. This corridor, together with more efficient short sea shipping transport, should complement the existing supply, thus allowing optimum development in south-west Europe. There are some environmental questions to study concerning the optimum location of the new corridor, as well as the political and institutional limitations.
Keywords: railway bottlenecks; railways; railroads; intermodality; trans-Pyrenean corridor; freight traffic; trans-Pyrenean railway; Iberian Peninsula. (search for similar items in EconPapers)
Date: 2009
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.inderscience.com/link.php?id=26070 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijpman:v:2:y:2009:i:4:p:388-402
Access Statistics for this article
More articles in International Journal of Procurement Management from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().