EconPapers    
Economics at your fingertips  
 

Communication problems in projects - a research study for construction site projects: a case study of Ghana

Stephen Akunyumu, Theophilus Adjei-Kumi, James Cofie Danku and Ernest Kissi

International Journal of Project Organisation and Management, 2019, vol. 11, issue 4, 343-361

Abstract: Communication is an indispensable element in every human interaction. In the construction industry, interaction is mainly characterised by unfamiliar groups of people who come together in a purpose-driven environment within short periods. These interactions, however, do not happen without encountering challenges. Thus, the aim of this paper is to identify the communication problems encountered on site during the construction of projects. The survey strategy was adopted for the study. Data gathered from construction managers were analysed with the principal component analysis. Overall, a total of six principal components: lack of access to information, cultural challenges, delay in information delivery, technical language challenge, lack of feedback, and lack of teamwork, emerged as the problems encountered on site communication. The results of the study bring to the fore some of the communication challenges facing the industry that requires immediate attention and solution. It is recommended for project managers and supervisors to recognise the impact of effective communication on project success and fashion out well thought out communication plans during the planning stage of the project.

Keywords: communication; problems; developing countries; Ghana. (search for similar items in EconPapers)
Date: 2019
References: Add references at CitEc
Citations:

Downloads: (external link)
http://www.inderscience.com/link.php?id=104197 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:ids:ijpoma:v:11:y:2019:i:4:p:343-361

Access Statistics for this article

More articles in International Journal of Project Organisation and Management from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().

 
Page updated 2025-03-19
Handle: RePEc:ids:ijpoma:v:11:y:2019:i:4:p:343-361