Managing large commercial projects with a tight schedule in China: a case study
Florence Yean Yng Ling and
Jia Hui Tiong
International Journal of Project Organisation and Management, 2008, vol. 1, issue 1, 86-104
Abstract:
With China's economic growth, more investments in built facilities are made and more foreign firms are expected to manage the construction of large and complex facilities. The aim of this paper is to identify the challenges that are faced in managing a large-sized commercial project in China and how foreign project managers resolve these problems. The case study research method is adopted and data are collected via in-depth interviews. The results show that the main problems are the schedule and budget overruns and poor workmanship and material quality. The strategies that are adopted to overcome these problems and the lessons learned are distilled from the case. These include obtaining a high commitment level from project team members, being more forceful in advising the owner, engaging privately-owned contractors (versus China's state-owned enterprises) and treating contractors as partners instead of adversaries.
Keywords: project management; China; international commissions; foreign projects; commercial projects; project scheduling. (search for similar items in EconPapers)
Date: 2008
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.inderscience.com/link.php?id=20030 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijpoma:v:1:y:2008:i:1:p:86-104
Access Statistics for this article
More articles in International Journal of Project Organisation and Management from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().