Assessment of risk paths in construction projects

Gulbin Ozcan, Irem Dikmen and M.Talat Birgonul

International Journal of Project Organisation and Management, 2011, vol. 3, issue 3/4, 316-334

Abstract: Risk identification is the most important step in project risk management (PRM), as the risk models are constructed based on previously defined risk sources and their interrelations. Although previous studies have concentrated on a one-way relation between risk factors, there are cause-effect relationships between risk sources, events and consequences. 'Risk paths' represent the causal relationships between risk sources, events and consequences and they should be assessed during risk identification, rather than individual risk factors. Furthermore, a complete risk assessment cannot be achieved without 'vulnerability' that shows the characteristics of a system to react to risk factors. Major aim of this paper is to propose a 'risk path assessment model' to overcome this shortcoming in PRM by combining 'risk path' and 'vulnerability' concepts. The 'risk path assessment model' includes risk and vulnerability (RV) parameters as well as their direct and indirect relationships. The model assesses RV by evaluating the level of vulnerability and magnitude of 'change' in a given project, so that the final impact of risk events on the project cost and duration is obtained.

Keywords: risk identification; risk assessment; risk paths; vulnerability; risk management; construction projects; construction industry; project risks. (search for similar items in EconPapers)
Date: 2011
References: Add references at CitEc
Citations: View citations in EconPapers (1)

Downloads: (external link)
http://www.inderscience.com/link.php?id=42036 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:ids:ijpoma:v:3:y:2011:i:3/4:p:316-334

Access Statistics for this article

More articles in International Journal of Project Organisation and Management from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().

 
Page updated 2025-03-19
Handle: RePEc:ids:ijpoma:v:3:y:2011:i:3/4:p:316-334