Resource-constrained project scheduling: a case study

Hongze Ma

International Journal of Productivity and Quality Management, 2012, vol. 10, issue 2, 148-163

Abstract: With increasing demand for project scheduling, different methods have been developed for this purpose. Among these existing methods, mixed-integer linear programming (MILP) is still one of the major approaches for resource-constrained project-scheduling problems. In this study, an integrated methodology is developed to schedule the projects for maintaining the oil platform for an energy company. In this methodology, firstly, a MILP model is used for project portfolio management to decide which projects will be performed immediately. Then, programme evaluation and review technique (PERT) and critical path method (CPM) are used to create the initial schedule, and MILP is used again for making detailed project schedule. In this detailed project schedule, the objective is to maximise the resource utilisation subject to different constraints, such as resource constraints, safety constraints, area constraints, activity calendar, etc. The optimisation model is solved by Microsoft Solver Foundation. The results show that the methodology developed in this study can improve the resource utilisation and satisfy all constraints.

Keywords: resource constraints; project scheduling; project portfolio management; mixed integer linear programming; MILP; critical path method; CPM; optimisation; Microsoft Solver Foundation; case study; oil platforms; oil platform maintenance; resource utilisation. (search for similar items in EconPapers)
Date: 2012
References: Add references at CitEc
Citations:

Downloads: (external link)
http://www.inderscience.com/link.php?id=48296 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:ids:ijpqma:v:10:y:2012:i:2:p:148-163

Access Statistics for this article

More articles in International Journal of Productivity and Quality Management from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().

 
Page updated 2025-03-19
Handle: RePEc:ids:ijpqma:v:10:y:2012:i:2:p:148-163