Lean manufacturing in the production of sprockets through value stream mapping – a case study
D. Ramesh Kumar and
S.R. Devadasan
International Journal of Productivity and Quality Management, 2025, vol. 45, issue 3, 309-333
Abstract:
During the last two decades, researchers and practitioners have carried out investigations on implementing lean manufacturing by applying value stream mapping (VSM) technique along the production lines of different automobile parts. Although being a part produced in large volume in automobile industry, sprocket has not been subjected to such investigation. In order to fill this gap, the case study reported in this paper was carried out. Initially, the production of a sprocket in the case study company was observed. Subsequently, the current and future state maps were drawn. In order to decrease the total lead time, two lean manufacturing approaches were specified in this future state map. On implementing these two lean manufacturing approaches, the total lead time decreased from 82.848 seconds to 70.568 seconds. The experience of conducting this case study indicated that VSM is a powerful technique for practically implementing lean manufacturing in organisations.
Keywords: lean manufacturing; value stream mapping; VSM; non-value adding activities; NVAAs; poka-yoke; automobile industry; sprocket. (search for similar items in EconPapers)
Date: 2025
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.inderscience.com/link.php?id=147829 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijpqma:v:45:y:2025:i:3:p:309-333
Access Statistics for this article
More articles in International Journal of Productivity and Quality Management from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().