EconPapers    
Economics at your fingertips  
 

Integrated production and shipping scheduling for a single manufacturer and multiple customers

Fangzhou Sun, Subhash C. Sarin, Yuqiang Wang and Akshat Kothyari

International Journal of Planning and Scheduling, 2025, vol. 3, issue 3, 161-193

Abstract: We investigate a supply chain scheduling problem involving a single manufacturer and multiple customers. Our aim is to integrate the production and shipping functions of a manufacturer for the objective of minimising the total cost consisting of: 1) the penalty of late deliveries computed based on the weighted number of tardy orders; 2) the shipping of orders to customers. Since this problem is NP-hard, besides an optimum-seeking algorithm, we also develop a fast heuristic both of which exploit the structural properties of the problem. The results of our computational investigation reveal the efficacy of our approaches and a significant benefit that accrues from integrating the production and distribution functions.

Keywords: scheduling; dynamic programming; branch-and-bound; combinatorial optimisation. (search for similar items in EconPapers)
Date: 2025
References: Add references at CitEc
Citations:

Downloads: (external link)
http://www.inderscience.com/link.php?id=149886 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:ids:ijpsii:v:3:y:2025:i:3:p:161-193

Access Statistics for this article

More articles in International Journal of Planning and Scheduling from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().

 
Page updated 2025-11-19
Handle: RePEc:ids:ijpsii:v:3:y:2025:i:3:p:161-193