Sustainable sequencing of N jobs on one machine: a fuzzy approach
Sanjoy Kumar Paul
International Journal of Services and Operations Management, 2013, vol. 15, issue 1, 44-57
Abstract:
Sequencing of jobs on one machine is a very common problem in scheduling. Several factors have to be taken into consideration to make the sequencing more realistic. In this paper, a fuzzy inference system is developed to tackle the uncertainty of variables in a sequencing problem. Arrival order, processing time, due date, slack time remaining, critical ratio, queue ratio and slack time remaining per operation, are considered as input variables and priority of jobs is considered as output variable. Multiple objectives are fulfilled as priority is obtained from the aggregated optimised result of individual rule developed in a rule editor. A job with higher priority is given more preferences in sequencing. MATLAB fuzzy logic toolbox is used to develop the model. A numerical example is presented to explain the approach.
Keywords: sequencing; single machine scheduling; fuzzy inference systems; FIS; MATLAB; fuzzy logic; modelling. (search for similar items in EconPapers)
Date: 2013
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.inderscience.com/link.php?id=53254 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijsoma:v:15:y:2013:i:1:p:44-57
Access Statistics for this article
More articles in International Journal of Services and Operations Management from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().