Study on early warning evaluation of project investment risk considering comprehensive simulation method
Weina Li,
Zhinan Cui and
Xiaochun Tang
International Journal of Sustainable Development, 2023, vol. 26, issue 3/4, 306-317
Abstract:
In order to overcome the problems of risk assessment method, such as too long assessment time and poor assessment accuracy, this paper proposes a project investment risk early warning assessment method considering the comprehensive simulation method. First, design a risk index system; secondly, the expert weight of project investment risk indicators is determined, and the objective weight of experts is calculated using similarity information; then, combined with CRITIC method, the mixed weights of index attributes are calculated; finally, the comprehensive simulation method is introduced to realise risk early warning evaluation. The results show that the accuracy of early warning under this method is always higher than 92%, and the evaluation time is always within 20 days, which effectively validates the effect of early warning evaluation of project investment risk under this method.
Keywords: comprehensive simulation method; CRITIC method; expert subjective weight method; project investment risk; evaluation matrix. (search for similar items in EconPapers)
Date: 2023
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.inderscience.com/link.php?id=134410 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijsusd:v:26:y:2023:i:3/4:p:306-317
Access Statistics for this article
More articles in International Journal of Sustainable Development from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().