Evaluation of the long-term effects on UK electricity prices following privatisation
Derek Bunn and
Kiriakos Vlahos
Fiscal Studies, 1989, vol. 10, issue 4, 104-116
Abstract:
With the publication of the UK Government's Electricity Bill (1988), planning was initiated for the break-up and sale of the Central Electricity Generating Board (CEGB) into three privatised companies. 'National Power' and 'PowerGen' would inherit 70 per cent and 30 per cent of the generating plant, respectively, and would compete for contracts to supply the twelve 'Area Boards', who are responsible for electric power distribution in separate geopraphical areas.
Date: 1989
References: Add references at CitEc
Citations: View citations in EconPapers (2)
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ifs:fistud:v:10:y:1989:i:4:p:104-116
Ordering information: This journal article can be ordered from
The Institute for Fiscal Studies 7 Ridgmount Street LONDON WC1E 7AE
Access Statistics for this article
More articles in Fiscal Studies from Institute for Fiscal Studies The Institute for Fiscal Studies 7 Ridgmount Street LONDON WC1E 7AE. Contact information at EDIRC.
Bibliographic data for series maintained by Emma Hyman ().