A Multi-Agent Optimization Method for Preemptive Resource-Constrained Project Scheduling
Yongyi Shou,
Wenjin Hu,
Changtao Lai and
Ying Ying
Additional contact information
Yongyi Shou: School of Management, Zhejiang University, Hangzhou, China
Wenjin Hu: Zhejiang University, Hangzhou, China
Changtao Lai: Zhejiang University, Hangzhou, China
Ying Ying: Zhejiang University, Hangzhou, China
International Journal of Information Technology Project Management (IJITPM), 2019, vol. 10, issue 1, 21-33
Abstract:
A multi-agent optimization method is proposed to solve the preemptive resource-constrained project scheduling problem in which activities are allowed to be preempted no more than once. The proposed method involves a multi-agent system, a negotiation process, and two types of agents (activity agents and schedule agent). The activity agents and the schedule agent negotiate with each other to allocate resources and optimize the project schedule. Computational experiments were conducted using the standard project scheduling problem sets. Compared with prior studies, results of the proposed method are competitive in terms of project makespan. The method can be extended to other preemptive resource-constrained project scheduling problems.
Date: 2019
References: Add references at CitEc
Citations:
Downloads: (external link)
http://services.igi-global.com/resolvedoi/resolve. ... 18/IJITPM.2019010102 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:igg:jitpm0:v:10:y:2019:i:1:p:21-33
Access Statistics for this article
International Journal of Information Technology Project Management (IJITPM) is currently edited by John Wang
More articles in International Journal of Information Technology Project Management (IJITPM) from IGI Global
Bibliographic data for series maintained by Journal Editor ().