ERP Project Success Perception by the Adopters: An Exploratory Study of the Projects beyond Budget and Schedule

Przemysław Lech

International Journal of Information Technology Project Management (IJITPM), 2013, vol. 4, issue 1, 13-26

Abstract: The purpose of this paper is to determine how the context of the deviations from the planned budget and/or schedule affect the success perception of the project in the eyes of the project management and top management of an adopting organization on a basis of three Enterprise System implementation projects, none of which has met the time-budget criterion. The projects are evaluated against the lists of project failure factors commonly cited in the literature. The results of the study show that deviation from the initially planned schedule and/or budget does not affect the success perception, providing that the project was properly managed and its business outcome is achieved.

Date: 2013
References: Add references at CitEc
Citations:

Downloads: (external link)
http://services.igi-global.com/resolvedoi/resolve. ... 018/jitpm.2013010102 (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:igg:jitpm0:v:4:y:2013:i:1:p:13-26

Access Statistics for this article

International Journal of Information Technology Project Management (IJITPM) is currently edited by John Wang

More articles in International Journal of Information Technology Project Management (IJITPM) from IGI Global
Bibliographic data for series maintained by Journal Editor ().

 
Page updated 2025-03-19
Handle: RePEc:igg:jitpm0:v:4:y:2013:i:1:p:13-26