Cost Performance Estimation in Construction Projects Using Fuzzy Time Series
Mostafa Salari,
Nooshin Yousefi and
Mohhmad Mahdi Asgary
Additional contact information
Mostafa Salari: Department of Industrial Engineering, Sharif University of Technology, Tehran, Iran
Nooshin Yousefi: Department of Industrial Engineering, Iran University of Science and Technology, Tehran, Iran
Mohhmad Mahdi Asgary: Department of System Engineering, University of Economic Sciences, Tehran, Iran
International Journal of Information Technology Project Management (IJITPM), 2015, vol. 6, issue 1, 66-75
Abstract:
In this paper, the authors develop a model to estimate future performance of construction projects. For the purpose of estimation, fuzzy times series models are used as an effective approach in estimation process. Furthermore, linguistic terms are applied to interpret the fuzzy-based results. The proposed model can assists project managers to develop their knowledge concerning the future aspects of project cost performance. It also provides the early warning of weak upcoming performance of project and extends the feasible time for corrective actions. Eventually, a small example has been provided to illustrate how the new model can be implemented in reality.
Date: 2015
References: Add references at CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://services.igi-global.com/resolvedoi/resolve. ... 18/ijitpm.2015010104 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:igg:jitpm0:v:6:y:2015:i:1:p:66-75
Access Statistics for this article
International Journal of Information Technology Project Management (IJITPM) is currently edited by John Wang
More articles in International Journal of Information Technology Project Management (IJITPM) from IGI Global
Bibliographic data for series maintained by Journal Editor ().