Abstract:
Critical Chain Project Management (CCPM) provided a tangible progress to the Project Management Body of Knowledge. The critical chain project management (CCPM) differs from the traditional Critical Path Method (CPM) which includes never changing resource dependencies. CCPM improves the project plan by aggregating uncertainty into buffers at the end of activity paths. In this research, one hundred twenty random projects were generated and analyzed using Microsoft Project software according to the traditional CPM and the CCPM once using the sum of squares (SSQ) method and another using the cut & past (C&PM) method. CCPM-SSQ method revealed an average savings of 13% and 43% in duration and cost, with a standard deviation of 21 and 11 for duration and cost respectively. While the CCPM-C&PM method revealed an average overestimation of about 2% in duration and 43% savings in cost, with a standard deviation of 25 and 11 for duration and cost respectively.
Date: 2016
References: Add references at CitEc
Citations:
Downloads: (external link)
http://services.igi-global.com/resolvedoi/resolve. ... 18/IJITPM.2016070105 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:igg:jitpm0:v:7:y:2016:i:3:p:74-87
Access Statistics for this article
International Journal of Information Technology Project Management (IJITPM) is currently edited by John Wang
More articles in International Journal of Information Technology Project Management (IJITPM) from IGI Global
Bibliographic data for series maintained by Journal Editor ().