Productivity, Work Force Availability, and Rational Production Scheduling
Pietro Sterpos
Additional contact information
Pietro Sterpos: Università di Firenze, Istituto di Ingegneria Meccanica, Firenze, Italy
Interfaces, 1980, vol. 10, issue 4, 25-29
Abstract:
In this paper, we discuss a fairly typical production scheduling problem. After some considerations on the structure of the process, a new approach is presented. The scheduling system proposed aims at the maximization of productivity taking into account the daily fluctuations in the work force. Encouraging results are reported.
Keywords: production/scheduling (search for similar items in EconPapers)
Date: 1980
References: Add references at CitEc
Citations:
Downloads: (external link)
http://dx.doi.org/10.1287/inte.10.4.25 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:orinte:v:10:y:1980:i:4:p:25-29
Access Statistics for this article
More articles in Interfaces from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().