EconPapers    
Economics at your fingertips  
 

Economic Analysis of Production and Inspection Procedure Changes in Hydraulic Line Manufacture

Fred Seppi and Richard E. Turley
Additional contact information
Fred Seppi: Metallurgical Laboratory, Ogden Air Logistics Center, Hill Air Force Base, Utah 84056
Richard E. Turley: Department of Industrial and Mechanical Engineering, The University of Utah, Salt Lake City, Utah 84112

Interfaces, 1982, vol. 12, issue 2, 5-13

Abstract: In this case study, a net investment of $6,300 is shown to produce annual savings of over $38,000 with present value benefits approaching $230,000, a savings-over-investment ratio of 40.2, and amortization within one year. Economic analysis was used to (a) justify new alloy melting equipment and (b) compare four alternative methods of manufacture. Implementation of the recommendations has reduced the rejection rate for hydraulic lines manufactured with low-melting alloy from between 60 and 80% in October 1979 to below 10% by May 1981.

Keywords: military:; test/evaluation (search for similar items in EconPapers)
Date: 1982
References: Add references at CitEc
Citations:

Downloads: (external link)
http://dx.doi.org/10.1287/inte.12.2.5 (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:inm:orinte:v:12:y:1982:i:2:p:5-13

Access Statistics for this article

More articles in Interfaces from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().

 
Page updated 2025-03-19
Handle: RePEc:inm:orinte:v:12:y:1982:i:2:p:5-13