It's the Process Not the Product (Most of the Time)
Allen F. Grum and
Rick Hesse
Additional contact information
Allen F. Grum: Department of Engineering, United States Military Academy, West Point, New York 10996
Rick Hesse: Babcock Graduate School of Management, Wake Forest University, 7659 Reynolda Station, Winston-Salem, North Carolina 27109
Interfaces, 1983, vol. 13, issue 5, 89-93
Abstract:
The process of problem formulation, analysis, and implementation may have more far-reaching effects than the specific solution or product for the particular case. Management science has been valued for the final number or answer rather than for its true strength, a method of gaining insight and understanding of the whole situation.
Keywords: professional:; OR/MS; implementation (search for similar items in EconPapers)
Date: 1983
References: Add references at CitEc
Citations:
Downloads: (external link)
http://dx.doi.org/10.1287/inte.13.5.89 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:orinte:v:13:y:1983:i:5:p:89-93
Access Statistics for this article
More articles in Interfaces from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().