EconPapers    
Economics at your fingertips  
 

A Modeling Framework for Planning and Control of Production in Discrete Parts Manufacturing and Assembly Systems

William Maxwell, John A. Muckstadt, L. Joseph Thomas and Jacques Vander Eecken
Additional contact information
William Maxwell: School of Operations Research and Industrial Engineering, Cornell University, Ithaca, New York 14853
John A. Muckstadt: School of Operations Research and Industrial Engineering, Cornell University, Ithaca, New York 14853
L. Joseph Thomas: Graduate School of Business and Public Administration, Cornell University, Ithaca, New York 14853
Jacques Vander Eecken: Department of Applied Economics, Katholieke Universiteit Leuven, Leuven, Belgium

Interfaces, 1983, vol. 13, issue 6, 92-104

Abstract: A modeling framework for production control, consisting of three phases, has several advantages over current MRP systems. The types of problems that exist in practice, currently available systems, and other literature in the area are also discussed.

Keywords: inventory/production; production scheduling (search for similar items in EconPapers)
Date: 1983
References: Add references at CitEc
Citations: View citations in EconPapers (3)

Downloads: (external link)
http://dx.doi.org/10.1287/inte.13.6.92 (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:inm:orinte:v:13:y:1983:i:6:p:92-104

Access Statistics for this article

More articles in Interfaces from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().

 
Page updated 2025-03-19
Handle: RePEc:inm:orinte:v:13:y:1983:i:6:p:92-104