The Fifth Column: The Case of the Unused Forecast or When Trying to Forecast What’s to Be, First Try Y = MX + B
Gene Woolsey
Additional contact information
Gene Woolsey: Department of Engineering, U.S. Military Academy, West Point, New York 10996
Interfaces, 1986, vol. 16, issue 6, 58-60
Abstract:
Once upon a time, a young MS/OR analyst for an airline received an unusual request for assistance---he was to review the volume-rate-forecasting model for the airline's reservation system. This state-of-the-art model was used for analyzing and forecasting univariate-time-series and transfer-function data based on an autoregressive integrated moving average technique. The request was unusual because its two originators had, between them, a combined total of five advanced degrees in mathematics. Our hero was, naturally, a bit curious about why such a pair were requesting help from a person holding an OR degree from an institution of the quick and dirty persuasion. After they explained that they wanted him to “fine tune” their model by looking at the white noise, degrees of differencing, residual normality, and perturbation values, he was even more curious. His curiosity disappeared when they admitted, through clenched teeth, that they had been ordered to seek his help.
Keywords: transportation: air; forecasting: applications (search for similar items in EconPapers)
Date: 1986
References: Add references at CitEc
Citations:
Downloads: (external link)
http://dx.doi.org/10.1287/inte.16.6.58 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:orinte:v:16:y:1986:i:6:p:58-60
Access Statistics for this article
More articles in Interfaces from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().