EconPapers    
Economics at your fingertips  
 

Ranking Hydroelectric Power Projects with Multicriteria Decision Analysis

Fred E. Wenstöp and Arne J. Carlsen
Additional contact information
Fred E. Wenstöp: Norwegian School of Management, PO Box 69, N-1341 Bekkestue, Norway
Arne J. Carlsen: A. B. Berdal A S, Kjorboveien 25, N-1300 Sandvika, Norway

Interfaces, 1988, vol. 18, issue 4, 36-48

Abstract: The Norwegian master plan for water resources called for ranking 542 hydropower projects. Two methods were used. The official one was process-oriented rather than analytical but was still intended to be formal and open to investigation. The ranked list produced was backed by the Norwegian government. We used the second method based on multicriteria decision analysis to review the first result. To our embarrassment, the two ranked lists turned out to be almost diametrically opposed to each other. In a public confrontation, political pragmatism was pitted against scientific ideals. Subsequent cooperation led to insight on a higher level and fruitful synthesis of methods.

Keywords: government: policies; decision analysis: applications (search for similar items in EconPapers)
Date: 1988
References: Add references at CitEc
Citations: View citations in EconPapers (5)

Downloads: (external link)
http://dx.doi.org/10.1287/inte.18.4.36 (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:inm:orinte:v:18:y:1988:i:4:p:36-48

Access Statistics for this article

More articles in Interfaces from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().

 
Page updated 2025-03-19
Handle: RePEc:inm:orinte:v:18:y:1988:i:4:p:36-48