EconPapers    
Economics at your fingertips  
 

Scheduling Repairs at Texas Instruments

Raj A. Sivakumar, Rajan Batta and Kazem Tehrani
Additional contact information
Raj A. Sivakumar: Corporate Research and Development, United Airlines, Chicago, Illinois 60666
Rajan Batta: Department of Industrial Engineering, State University of New York at Buffalo, Buffalo, New York 14260
Kazem Tehrani: Texas Instruments Inc., Cypress, Texas 77429

Interfaces, 1993, vol. 23, issue 4, 68-74

Abstract: We developed a single-shift model at Texas Instruments' Cypress plant to schedule repairs of electronic assemblies. The model considers such shop-floor issues as technician capabilities and part preferences. While providing satisfactory results, the model has also found immediate acceptance on the shop floor, as it does not block out the human element—the supervisors.

Keywords: production/scheduling: job shop; industries: electric/electronic (search for similar items in EconPapers)
Date: 1993
References: Add references at CitEc
Citations:

Downloads: (external link)
http://dx.doi.org/10.1287/inte.23.4.68 (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:inm:orinte:v:23:y:1993:i:4:p:68-74

Access Statistics for this article

More articles in Interfaces from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().

 
Page updated 2025-03-19
Handle: RePEc:inm:orinte:v:23:y:1993:i:4:p:68-74