The Volkswagen Pre-Production Center Applies Operations Research to Optimize Capacity Scheduling
Christian Weckenborg (),
Karsten Kieckhäfer (),
Thomas S. Spengler () and
Patricia Bernstein ()
Additional contact information
Christian Weckenborg: Institute of Automotive Management and Industrial Production, Technische Universität Braunschweig, 38106 Braunschweig, Germany
Karsten Kieckhäfer: Chair of Production and Logistics Management, FernUniversität in Hagen, 58084 Hagen, Germany
Thomas S. Spengler: Institute of Automotive Management and Industrial Production, Technische Universität Braunschweig, 38106 Braunschweig, Germany
Patricia Bernstein: Volkswagen Group, 38436 Wolfsburg, Germany
Interfaces, 2020, vol. 50, issue 2, 119-136
Abstract:
The Volkswagen Pre-Production Center (VPC) is responsible for the entire prototype assembly of the Volkswagen brand. In their assembly sites, however, they often cannot employ their manufacturing staff to the full utilization level, and therefore, the manufacturing volume is low. Maximizing the manufacturing volume for a given available capacity is a frequently pursued objective in industrial manufacturing. The planning task of capacity scheduling contributes to this objective by deciding on resource allocation and the selection and scheduling of orders. We were asked to evaluate possible operations research/management science (OR/MS) solutions for their capacity scheduling problem. To this end, we developed a prototype for capacity scheduling based on binary integer programming. After the prototype had revealed high improvement potential, we developed a spreadsheet-based decision support system (DSS) for daily capacity scheduling. The schedules generated by the DSS were substantially better than the solutions generated by the current manual procedure, in terms of both accomplished manufacturing volume and planning effort. After successful test implementation and rollout, the VPC estimated the annual cost savings to lie in the six-digit Euro range. Meanwhile, we continue spreading OR/MS methods to neighboring departments of the VPC.
Keywords: automotive assembly; prototype; capacity scheduling; decision support system; spreadsheets (search for similar items in EconPapers)
Date: 2020
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (3)
Downloads: (external link)
https://doi.org/10.1287/inte.2020.1029 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:orinte:v:50:y:2020:i:2:p:119-136
Access Statistics for this article
More articles in Interfaces from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().