Telephone Sales Manpower Planning at Qantas
Adel Gaballa and
Wayne Pearce
Additional contact information
Adel Gaballa: Planning Department, Qantas Airways Limited, Sydney, Australia 2000
Wayne Pearce: Planning Department, Qantas Airways Limited, Sydney, Australia 2000
Interfaces, 1979, vol. 9, issue 3, 1-9
Abstract:
When the traditional procedure for planning annual manpower requirements for the telephone sales reservation offices of Qantas Airways was replaced by a model utilizing queueing and integer linear programming techniques, savings in excess of US$235,000 were realized in staff reductions over a two-year period, and investigation into applications in several other Qantas service areas continues.Relationships of staff size to waiting time and service time are also evaluated.
Keywords: planning: corporate; production scheduling: work studies (search for similar items in EconPapers)
Date: 1979
References: Add references at CitEc
Citations: View citations in EconPapers (11)
Downloads: (external link)
http://dx.doi.org/10.1287/inte.9.3.1 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:orinte:v:9:y:1979:i:3:p:1-9
Access Statistics for this article
More articles in Interfaces from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().