The Fifth Column---Ten Ways to Go Down With MRP
Gene Woolsey
Additional contact information
Gene Woolsey: Colorado School of Mines
Interfaces, 1979, vol. 9, issue 5, 77-80
Abstract:
The purpose of this short article is to comment on some reasons why MIS systems, such as Materials Requirements Planning, for example, can be successful. However, I will do this by enumerating 10 reasons why MRP systems have gone down to defeat in recent industrial history. Now, I must also warn the reader that I have usually appeared at the scene of the crime long after the installation was terminal. I suspect that consultants are usually called in at such times because (1) if the consultant can pull it off, obviously the situation wasn't so bad, and/or (2) if the consultant blows it, the situation was hopeless anyway ( obviously ).The following methods are presented here to show some common errors made by management in the acquisition and implementation (attempted) of MRP systems. It is hoped that the translation of the results to other types of MIS systems is obvious to the most casual observer.
Keywords: inventory/production; man-machine methods (search for similar items in EconPapers)
Date: 1979
References: Add references at CitEc
Citations:
Downloads: (external link)
http://dx.doi.org/10.1287/inte.9.5.77 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:orinte:v:9:y:1979:i:5:p:77-80
Access Statistics for this article
More articles in Interfaces from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().