EconPapers    
Economics at your fingertips  
 

Case—Agile Auto Sub Assemblies: Challenges in Managing Growth, Resource Productivity, and Demand Variability

Balaraman Rajan () and N. Ravichandran ()
Additional contact information
Balaraman Rajan: California State University East Bay, Hayward, California 94542;
N. Ravichandran: Indian Institute of Management Ahmedabad, Ahmedabad, Gujarat 380015, India

INFORMS Transactions on Education, 2019, vol. 20, issue 1, 44-48

Keywords: assembly line design; level production; utilization; operations; production; critical thinking (search for similar items in EconPapers)
Date: 2019
References: Add references at CitEc
Citations:

Downloads: (external link)
https://doi.org/10.1287/ited.2019.0206cs (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:inm:orited:v:20:y:2019:i:1:p:44-48

Access Statistics for this article

More articles in INFORMS Transactions on Education from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().

 
Page updated 2025-03-19
Handle: RePEc:inm:orited:v:20:y:2019:i:1:p:44-48