A hazard analysis of federal permitting under the national environmental policy act of 1970
Michael Bennon,
Daniel Hormaza and
R. Richard Geddes ()
Additional contact information
Michael Bennon: Stanford Center for Democracy, Development and the Rule of Law
Daniel Hormaza: Cornell University
R. Richard Geddes: Cornell University
Journal of Regulatory Economics, 2024, vol. 65, issue 1, No 8, 154-183
Abstract:
Abstract The National Environmental Policy Act (NEPA) of 1970 requires federal agencies to assess the environmental impact of proposed federal actions. NEPA thus affects delivery of a wide range of infrastructure projects. NEPA requires the completion of an Environmental Impact Statement (EIS) for environmentally impactful federal actions. For infrastructure projects this can entail significant delays. A typical EIS now takes about four and one-half years and is over 600 pages long. Some EIS’s take over a decade to complete. We provide the first detailed analysis of project approval times under NEPA by examining 1269 EIS permitting processes. We analyze empirically the well-defined interval from Notice of Intent to file to Record of Decision (ROD). We use a Cox proportional hazard model to estimate the impact of several factors on EIS duration. Factors include permits featuring major construction, those including private investment, those for projects located in states with restrictive environmental laws, those using the federal permitting “dashboard,” and those publishing a Supplemental EIS prior to the ROD. We find that privately financed projects receive faster permitting, while projects involving major construction, those undertaken in restrictive states, and those utilizing the federal permitting dashboard, face slower permitting times. We also explore links between EIS page counts and permitting time. Greater EIS page counts are associated with longer permitting times. We conclude by examining EIS completion during economic stimulus programs such as the American Recovery and Reinvestment Act (ARRA), as well as the frequency of EIS completion by the federal government.
Keywords: National environmental policy act (NEPA); Permits; Infrastructure; Environmental-impact statement (search for similar items in EconPapers)
JEL-codes: H1 K23 R4 (search for similar items in EconPapers)
Date: 2024
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
http://link.springer.com/10.1007/s11149-023-09465-y Abstract (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:kap:regeco:v:65:y:2024:i:1:d:10.1007_s11149-023-09465-y
Ordering information: This journal article can be ordered from
http://www.springer. ... on/journal/11149/PS2
DOI: 10.1007/s11149-023-09465-y
Access Statistics for this article
Journal of Regulatory Economics is currently edited by Menaham Spiegel
More articles in Journal of Regulatory Economics from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().