Decentralization of contracts with interim side-contracting
Bernd Theilen ()
Theory and Decision, 2012, vol. 73, issue 4, 590 pages
Abstract:
This article gives a new explanation for the phenomenon of subcontracting. A model in which a principal contracts two agents who work in a sequence on a project, have soft information and can collude is considered. Side-contracts between agents can be signed at any stage of the game. It is shown that in this setting both a decentralized contracting structure, in which contracting of the agents at the initial production stage is delegated to the agent at the final production stage, and a centralized structure, in which the principal directly contracts both agents, can be superior for the principal. The article derives the conditions under which this holds. The results give an explanation for recently observed tendencies in public procurement of design and construction activities. Copyright Springer Science+Business Media, LLC. 2012
Keywords: Contract delegation; Collusion; Interim side-contracting; Moral hazard; D23; D82; L14; L22 (search for similar items in EconPapers)
Date: 2012
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
http://hdl.handle.net/10.1007/s11238-011-9290-3 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:kap:theord:v:73:y:2012:i:4:p:561-590
Ordering information: This journal article can be ordered from
http://www.springer. ... ry/journal/11238/PS2
DOI: 10.1007/s11238-011-9290-3
Access Statistics for this article
Theory and Decision is currently edited by Mohammed Abdellaoui
More articles in Theory and Decision from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().