Implementing Target Costing Method in a Construction Project
Anamaria Tepes-Bobescu () and
Ileana Sorina Rakos ()
Knowledge Horizons - Economics, 2015, vol. 7, issue 3, 168-175
Abstract:
Article discusses the implementation of target costing method in a construction project that takes place in Romania. There are treated the concepts of cost and target cost of specialty literature and also are presented the stages to be completed in implementing target costing method. To implement targeted costing method a case study was done on a building project. The article ends with authors’ conclusions based on implementing target costing method in a construction project and the advantages and its limits.
Keywords: Target costing; construction project; cost management; direct costs; indirect costs (search for similar items in EconPapers)
JEL-codes: M41 (search for similar items in EconPapers)
Date: 2015
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
http://orizonturi.ucdc.ro/arhiva/khe-vol7-nr3-2015/Tepes_Rakos.pdf (application/pdf)
http://orizonturi.ucdc.ro/arhiva/khe-vol7-nr3-2015/Tepes_Rakos.pdf (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:khe:journl:v:7:y:2015:i:3:p:168-175
Access Statistics for this article
More articles in Knowledge Horizons - Economics from Faculty of Finance, Banking and Accountancy Bucharest,"Dimitrie Cantemir" Christian University Bucharest Contact information at EDIRC.
Bibliographic data for series maintained by Adi Sava ().