Analysis of the problems of managing business processes of engineering companies in the implementation of investment projects

Gurenko Anna () and Gurenko Sergey ()
Additional contact information
Gurenko Anna: Azov Maritime Institute of National University «Odessa Maritime Academy», Mariupol
Gurenko Sergey: Donetsk State University of Management, Mariupol

Technology audit and production reserves, 2020, vol. 3, issue 4(53), 32–35

Abstract: The object of research is a business process management system of engineering companies. The paper considers the existing system of interaction between design institutes, engineering companies and manufacturing enterprises implementing investment projects. In particular, the differences in the construction of business processes in previously existing design institutions and modern engineering companies are identified. The research methodology is based on theoretical and methodological analysis of scientific literature, statistical methods, as well as observation, comparative method, description, measurement. The use of scientific research methods has revealed weaknesses and contradictions in the business process management system. The results of this research indicate that the development, verification and approval of design and estimate specifications are the main business process of engineering companies. It is proved that these business processes are an integral part of the investment project. Therefore, for the successful implementation of company projects, customers attract a large number of external contracting organizations – design, engineering, construction companies. The increase in the number of participants in the investment process significantly complicates the construction of business processes, which leads to an increase in the timing of development, verification and approval of design and estimate specifications. The analysis allows to identify the causes of inconsistencies when working with specification. The main reasons for increasing the verification time are systemic problems in organizing the interaction of project participants. It is determined that the pre-existing holders of archival design specification that provided comprehensive turnkey services have practically disappeared from the market. Contracting organizations appeared in their place, separated from large specialized design organizations. The created contracting organizations work in different versions of the software, therefore they created sets of documents of varying degrees of detail of design decisions. In general, it is recommended to optimize the docking of documents between participants in investment projects. The implementation of the proposed measures becomes possible in the context of the introduction of information technology based on joint teamwork to create an electronic model.

Keywords: investment project; operational activities; design and estimate specifications; process optimization; management information systems; activity planning (search for similar items in EconPapers)
Date: 2020
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
http://journals.uran.ua/tarp/article/view/207243

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:nos:ddldem:36

Access Statistics for this article

Technology audit and production reserves is currently edited by Лилия Фролова

More articles in Technology audit and production reserves from Socionet, Technology audit and production reserves
Bibliographic data for series maintained by Алина Макаренко ().

 
Page updated 2025-03-19
Handle: RePEc:nos:ddldem:36