Abstract:
The object of research is a model network schedule for performing a complex of operations. One of the most problematic areas is the lack of a unified procedure that allows finding a solution to the problem of compromise optimization, for which the optimization criteria can have a different nature of the influence of input variables on them. In this study, such criteria are the criteria for the uniformity of the workload of personnel and the distribution of funds. Two alternative cases are considered: with monthly planning and with quarterly planning of allocation of funds and staff load. The methods of mathematical planning of the experiment and the ridge analysis of the response surface are used. The peculiarities of the proposed procedure for solving the problem of compromise optimization are its versatility and the possibility of visualization in one-dimensional form – the dependence of each of the alternative criteria on one parameter describing the constraints. The solution itself is found as the point of intersection of equally labeled ridge lines, which are curves that describe the locally optimal values of the output variables. The proposed procedure, despite the fact that it is performed only on a model network diagram, can be used to solve the trade-off optimization problem on arbitrary network graphs. This is due to the fact that the combination of locally optimal solutions in a parametric form on one graph allows visualizing all solutions to the problem. The results obtained at the same time make it possible to select early dates for the start of operations in such a way that, as much as possible, take into account possible difficulties due to the formation of bottlenecks at certain stages of the project. The latter may be due to the fact that for the timely execution of some operation, it may be necessary to combine two criteria, despite the fact that the possible costs may turn out to be more calculated and estimated as optimal.
Keywords: compromise optimization; model network schedule; network schedule optimization; uniformity of funds distribution; uneven workload of personnel; ridge line (search for similar items in EconPapers)
JEL-codes: C44 R58 (search for similar items in EconPapers)
Date: 2021
References: View complete reference list from CitEc
Citations:
Downloads: (external link)
http://journals.uran.ua/tarp/article/view/225527
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:nos:ddldem:68
Access Statistics for this article
Technology audit and production reserves is currently edited by Лилия Фролова
More articles in Technology audit and production reserves from Socionet, Technology audit and production reserves
Bibliographic data for series maintained by Алина Макаренко ().