EconPapers    
Economics at your fingertips  
 

DETERMINATION OF RESIDUAL VALUE WITHIN THE COST BENEFIT ANALYSIS FOR THE PROJECTS FINANCED BY THE EUROPEAN UNION

Droj Laurentiu ()
Additional contact information
Droj Laurentiu: University of Oradea, Faculty of Economics

Annals of Faculty of Economics, 2011, vol. 1, issue 2, 354-360

Abstract: This paper will be later used within the Doctoral thesis: "The Mechanism of Financing Investment Projects by Usage of European Structural Funds", which is currently under development at the University Babeș Bolyai Cluj Napoca, Faculty of Economics and Business Management, under the coordination of the prof. univ. dr. Ioan Trenca. An increasing debate is rising recently between the academic community, the business community, the private lending institutions(banks, investment funds, etc.) and the officials of the Romanian Government and of the European Union regarding the proposed method for calculation of the residual value in the European financed investment projects. Several methods of calculation of the Residual Value were taken into consideration and contested by different parties in order to prepare and to submit financial analysis studies for investment projects proposed to be financed within the European Regional Development Fund(ERDF). In this context, the present paper proposes to address the three main methods of calculation of the residual value and later to study its impact over the indicators, especially over the Internal Rate of Return, obtained in the financial analysis for an investment project proposed by a Romanian medium sized company. In order to establish the proper method which should be used for selection and calculation of the residual value previously published studies and official documentations were analyzed. The main methods for calculation of the residual values were identified as being the following: A. the residual market value of fixed assets, as if it were to be sold, B. accounting economic depreciation formula and C. by using the net present value of the cash flows. Based on these methods the research model was elaborated, and using the financial data of the proposed infrastructure investment was created a case study. According to the realized study a pattern was established for proper determination of residual value and for determination of IRR and methods A and C were proposed to be used. This paper tries to analyze a specific problem of the Romanian enterprises which access European funding, so it can be further used to improve the current methodology of the ERDF programme in Romania: Sectorial Operational Programme "Increase of Economic Competitiveness".

Keywords: Cost benefit Analysis; Residual value; IRR; Investment; Structural Funds; Valuation (search for similar items in EconPapers)
JEL-codes: C12 C63 F35 G30 G32 G38 O16 (search for similar items in EconPapers)
Date: 2011
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)

Downloads: (external link)
http://anale.steconomiceuoradea.ro/volume/2011/n2/047.pdf (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:ora:journl:v:1:y:2011:i:2:p:354-360

Access Statistics for this article

More articles in Annals of Faculty of Economics from University of Oradea, Faculty of Economics Contact information at EDIRC.
Bibliographic data for series maintained by Catalin ZMOLE ( this e-mail address is bad, please contact ).

 
Page updated 2025-03-19
Handle: RePEc:ora:journl:v:1:y:2011:i:2:p:354-360