Economic lot scheduling problem with imperfect production processes
M Ben-Daya () and
M Hariga
Additional contact information
M Ben-Daya: King Fahd University
M Hariga: King Saud University
Journal of the Operational Research Society, 2000, vol. 51, issue 7, 875-881
Abstract:
Abstract In this paper, we model the effects of imperfect production processes on the economic lot scheduling problem (ELSP). It is assumed that the production facility starts in the in-control state producing items of high or perfect quality. However the facility may deteriorate with time and shifts at a random time to an out of control state and begins to produce nonconforming items. A mathematical model is developed for ELSP taking into account the effect of imperfect quality and process restoration. Numerical examples are presented to illustrate important issues related to the developed model.
Keywords: economic lot scheduling problem; quality; imperfect processes; lot sizing (search for similar items in EconPapers)
Date: 2000
References: Add references at CitEc
Citations: View citations in EconPapers (16)
Downloads: (external link)
http://link.springer.com/10.1057/palgrave.jors.2600974 Abstract (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:pal:jorsoc:v:51:y:2000:i:7:d:10.1057_palgrave.jors.2600974
Ordering information: This journal article can be ordered from
http://www.springer. ... search/journal/41274
DOI: 10.1057/palgrave.jors.2600974
Access Statistics for this article
Journal of the Operational Research Society is currently edited by Tom Archibald and Jonathan Crook
More articles in Journal of the Operational Research Society from Palgrave Macmillan, The OR Society
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().