Scheduling of Resource-Constrained Projects
J Wilson
Additional contact information
J Wilson: Loughborough University
Journal of the Operational Research Society, 2001, vol. 52, issue 7, 846-846
Date: 2001
References: Add references at CitEc
Citations:
Downloads: (external link)
http://link.springer.com/10.1057/palgrave.jors.2601247 Abstract (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:pal:jorsoc:v:52:y:2001:i:7:d:10.1057_palgrave.jors.2601247
Ordering information: This journal article can be ordered from
http://www.springer. ... search/journal/41274
DOI: 10.1057/palgrave.jors.2601247
Access Statistics for this article
Journal of the Operational Research Society is currently edited by Tom Archibald and Jonathan Crook
More articles in Journal of the Operational Research Society from Palgrave Macmillan, The OR Society
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().