Erratum: A savings index heuristic algorithm for flowshop scheduling with sequence-dependent setup times
S R Das,
J N D Gupta and
B M Khumawala
Additional contact information
S R Das: George Mason University
J N D Gupta: The University of Alabama in Huntsville
B M Khumawala: University of Houston
Journal of the Operational Research Society, 2004, vol. 55, issue 12, 1369-1369
Date: 2004
References: Add references at CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://link.springer.com/10.1057/palgrave.jors.2601873 Abstract (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:pal:jorsoc:v:55:y:2004:i:12:d:10.1057_palgrave.jors.2601873
Ordering information: This journal article can be ordered from
http://www.springer. ... search/journal/41274
DOI: 10.1057/palgrave.jors.2601873
Access Statistics for this article
Journal of the Operational Research Society is currently edited by Tom Archibald and Jonathan Crook
More articles in Journal of the Operational Research Society from Palgrave Macmillan, The OR Society
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().