Two empirical uncertain models for project scheduling problem
Chunxiao Ding and
Yuanguo Zhu
Additional contact information
Chunxiao Ding: Nanjing University of Science and Technology, Nanjing, China
Yuanguo Zhu: Nanjing University of Science and Technology, Nanjing, China
Journal of the Operational Research Society, 2015, vol. 66, issue 9, 1471-1480
Abstract:
The project scheduling problem with uncertain activity durations is considered, and two types of models for uncertain project scheduling problems are established according to different management requirements. These models are transformed to their crisp forms, which may be solved by classical optimization methods. For the models that could not be transformed to their crisp forms, an uncertain simulation is employed to approximate uncertain functions. Finally, two numerical examples are given to illustrate the usefulness of proposed models.
Date: 2015
References: Add references at CitEc
Citations: View citations in EconPapers (4)
Downloads: (external link)
http://www.palgrave-journals.com/jors/journal/v66/n9/pdf/jors2014115a.pdf Link to full text PDF (application/pdf)
http://www.palgrave-journals.com/jors/journal/v66/n9/full/jors2014115a.html Link to full text HTML (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:pal:jorsoc:v:66:y:2015:i:9:p:1471-1480
Ordering information: This journal article can be ordered from
http://www.springer. ... search/journal/41274
Access Statistics for this article
Journal of the Operational Research Society is currently edited by Tom Archibald and Jonathan Crook
More articles in Journal of the Operational Research Society from Palgrave Macmillan, The OR Society
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().