EconPapers    
Economics at your fingertips  
 

The Pension Bomb and Possible Solutions

Mahmood Khalid (), Naseem Faraz and Muhammad Ashraf
Additional contact information
Naseem Faraz: Pakistan Institute of Development Economics, Islamabad.

The Pakistan Development Review, 2021, vol. 60, issue 2, 225-230

Abstract: Public sector employment remains an attraction for two important reasons: job security and a guaranteed pension (Dixit, 2002).1 Unlike other countries, Pakistan has not reformed its public sector pension system and has maintained a pay-as-u–go defined benefits type pension system which has resulted in build up of unfunded liability for the government. Pakistan practices a legacy pension system where pensioners are paid directly from the revenues as part of the current expenditures. This practice is inherently unsustainable as pension expenditure growing at around 25 percent, cannot be provided from an economy growing at a significantly lower rate. The pension burden is therefore bound to grow, doubling every four-years. In the fiscal year 2018-19, federal superannuation and pension expenditures were almost 78 percent of the value for PSDP expenditures and it increased in FY 2019-20 to 87 percent (463,419 million Rupees and 533,220 million Rupees respectively). The share of pensions as a percentage of current expenditures is also increasing overtime (for FY 2019-20 it stood around 7.6 percent).

Date: 2021
References: Add references at CitEc
Citations:

Downloads: (external link)
https://pide.org.pk/wp-content/uploads/225-230.pdf (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:pid:journl:v:60:y:2021:i:2:p:225-230

Access Statistics for this article

More articles in The Pakistan Development Review from Pakistan Institute of Development Economics Contact information at EDIRC.
Bibliographic data for series maintained by Khurram Iqbal ().

 
Page updated 2025-03-19
Handle: RePEc:pid:journl:v:60:y:2021:i:2:p:225-230